Culvert definition
A culvert is a closed conduit or tunnel used to convey water from one area to another, normally from one side of a road to the other side.
Typically culverts are box shaped, round or elliptical in cross section. They are often pre-fabricated and can be made from pipes, reinforced concrete or other materials that are embedded within the surrounding landscape to create a bridge-like structure that permits the stable and proper flow of water under an obstacle such as a road, and can help alleviate flooding and reduce erosion.
Culverts can also be used to move rainwater runoff along, under or away from highways.
The difference between a bridge and a culvert is that a bridge is intended to allow passage over an obstacle such as a body of water, whereas a culvert is intended to permit a body of water to pass under an obstacle such as a road. A culvert is provided for the ‘benefit’ of the water, and typically has a base over which the water flows. A bridge is provided for the passage of traffic, and provides a base over which that traffic can pass.
NB A drop inlet culvert is a form of culvert used on sloping ground where the water level has to be lowered to pass under a railway or road.
Culvert, screen and outfall manual, (CIRIA C786) published by CIRIA in 2019, defines a culvert as: 'A covered channel or pipe which prevents the obstruction of a watercourse or drainage path by an artificial construction.' It also gives the following definitions:
- Culvert condition appraisal as: ‘…the range of activities involved with the qualitative evaluation of an asset’s condition and performance (ie the gathering of existing data, inspection, investigation and structural assessment).’
- Condition assessment is: ‘ A measure or measures of the culvert carried our as a precursor to the performance assessment, for example, measurements of degrees of sedimentation or in situ tests on the fabric of the culvert.’
- Performance assessment is: ‘A comparison of present performance against performance requirements. The assessment considers the effect of a condition on each performance requirement and the effect of each performance requirement on the performance of the subsystem or system. The key to performance assessment is an understanding of the link between asset (or system) condition and its response under a range of loading conditions. Outputs of this stage are the probability of failure and residual life.
- Condition monitoring is: ‘Continuous or periodic inspection, assessment, measurement and interpretation of the resultant data to indicate the condition of the specific component. This will determine the need for some preventative or remedial action.’
[edit] Related articles on Designing Buildings Wiki
- Bund.
- Catchment flood management plans.
- Detention pond.
- Environment Agency.
- Flood and water management act.
- Flood insurance.
- Flood risk management plans
- Flood risk.
- Highway drainage.
- Manhole.
- Pitt Review Lessons learned from the 2007 floods.
- Rainwater harvesting.
- River engineering.
- Safe working in drains and sewers.
- Sewer construction.
- Soakaway.
- Sustainable Urban Drainage Systems.
- Swales.
- Water engineering.
- Workplace design – flood protection.
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.
























